Taking into consideration irrigation implementation, socio-economic and ecological functions, the following criteria were developed for site selection: The main priorities focus on small scale size, economic viability, in line with District Development Plan and the needs of the villagers, less impact on environment and ecological functions.An assessment of the existing situation and site selection was carried out during project inception phase in October and November 2010 by revisiting all project target villages to confirm the needs of villagers and suitability of potential sites. Above criteria were applied to screen the potential irrigation sites. The portion of irrigated area is still small compared to available paddy land. According to the district information in 2010, only 8 schemes with area of 1,350 ha have been irrigated for double cropping per year. This makes up 15% of total paddy land (8,620 ha) in the basin. The rest is classified as rain-fed and upland paddy area with single cropping per year. Most of the exiting irrigation schemes are suited in the low reaches of the basin but not serving for the poor people in the upland area.

As result from 8 survey and design schemes, 5 schemes were selected for construction. The reason of dropping 3 schemes was the budget availability. In addition, through the screening of IWRM concept, pumping scheme was dropped out due to the concern of minimum flow which intends to take from the main stream and this will be reducing 10% of flow quantity in the dry season. 

irrigation8
irrigation9
irrigation10
irrigation19
irrigation11
 

irrigation7
irrigation20

Before construction work was initiated, the orientation meetings were organised during October and November 2012 to keep farmers informed about the field work activities and possibility of villager’s contribution. The affected families due to construction work were also reviewed. The villagers/beneficiaries showed high commitment of participating in the project activities by contributing volunteer labours about 2-3 persons-day in a construction site. Village authorities played a major role in coordinating with District staffs and assisting the conflict solution which was often happened during construction period. The type of confliction includes e.g. complaining of due to the loss of land and properties caused by canal alignment passing, erosion leading in paddy field,  etc. 

Due to budget availability and environmental issue, 5 out of 8 schemes were chosen by the Steering Committee Meeting in February 2012 for being constructed.   

Irrigation schemes is mainly designed for supplying water for dry-season cultivation but also for supplementary supply water for wet-season cultivation. Due to the water storage capacity and delivered facilities, it is estimated that 138 ha can be benefit from the project’s irrigation system development. During wet season, a large area can benefit through higher water availability. In total, about 139 households are calculated to benefit. 

irrigation13
irrigation12
irrigation15
irrigation16
irrigation17
irrigation14
irrigation21

The minimum flow was assessed to avoid negative environmental impact from irrigation development. The minimum flow is used for estimating the capacity of irrigated area and as a basis for scheme operation during the dry season in avoiding downstream impact.