Nam Ton Watershed

Knowledge Platform

The most important output of the PWLUP is the building of a new Land Use Plan at watershed level. This work is still on going (April 2014). The next figure shows the case of Hai Nua with the existing land use map and the new map as the result of the PWLUP process 

LandUseMapHaiNua
 Mapping the existing land use and the land use resulting from the PWLUP process